Completed Civil Engineering Projects

MARINA BARRAGE
Value of Works : $226,000,000
Client: PUB
An iconic State-of-the-Art Marina Barrage is a 3-in -1 reservoir built in the city to serve as the water catchment area, a comprehensive flood control facility and a marina recreation for water sports.
Changi Water Treatment Plant Contract C1A, C3A & C6A
Value of Works : $399,600,000
Client: PUB
Changi Water Reclamation Plant is a State-of –the-Art facility built for the treatment and re-cycling of used water. It is the heart of the Deep Tunnel Sewerage System and one of the world’s biggest facilities in terms of treatment capacity, handling and treating up to 800,000 m3/day of used water.
COMMON SERVICE TUNNEL
Value of Works : $41,700,000
Client: URA Pte Ltd
Common Service Tunnel is an underground tunnel network built to house the various utility piping and cabling such as district cooling water, electricity, telecommunications and water services for distribution to developments in the Marina Bay area.
Year of Completion: 1999
Value of Works($'million): 12
Client: Sentosa Cove Pte Ltd
Proposed Construction of Canal Walls, Bridges Sluices, Locks, Mooring Posts and Ancillary Works on Sentosa Cove at Lot 261 MK 34 Contract No. 87
Year of Completion: 1998
Value of Works($'million): 161
Client: PSA
Construction of Phase 1B container stacking yard for new container terminal at Pasir Panjang Road
Shantou.jpg (9643 bytes)
Year of Completion: 1998
Value of Works($'million): 122
Client: Yuedong Estate Development Co. Ltd
Land Reclamation, Phase I, at Xinjin River Mouth, Shantou, China (Approx. 477 ha)
Year of Completion: 1997
Value of Works($'million): 46
Client: PWD
Holland Road / Farrer Road / Queensway Interchange
Year of Completion: 1996
Value of Works($'million): 39
Client: LTA
Tampines Expressway / Lorong Halus Interchange
KallangRiver.jpg (19234 bytes)
Year of Completion: 1995
Value of Works($'million): 50
Client: ENV
Improvement to Kallang River from Braddell Road to Jalan Toa Payoh
Keppel.jpg (14056 bytes)
Year of Completion: 1994
Value of Works($'million): 24
Client: PSA
Conversion Of berths M19 to M22 into Container Berths including Construction of Container Stacking Yard (Phase 1), Keppel Terminal
Year of Completion: 1994
Value of Works($'million): 18
Client: ENV
Reconstruction of Geylang River (Contract 2)
Year of Completion: 1993
Value of Works($'million): 14
Client: PWD
PIE Extension & Realignment - Hong Kah Interchange
Year of Completion: 1990
Value of Works($'million): 36
Client: ENV
Bukit Timah Flood Alleviation Scheme Phase IIA Contract 4
Year of Completion: 1984
Value of Works($'million): 36
Client: PWD
Central Expressway from Jalan Toa Payoh / PIE to Thomson Road

Completed Building Projects

Starville.jpg (33478 bytes)
STARVILLE
Starville is the first freehold 12-storey condominium built with a rooftop star-gazing observatory with a theme revolving around the constellation of stars for residents to experience the thrills of the galaxy of the outer world.
Caldecott.jpg (33478 bytes)
BUNGALOWS @CALDECOTT
Is a 4-unit freehold luxurious bungalows project specially built with “infinity” Jacuzzis and swimming pools and lifts distinctively designed to overlook a beautifully man-made canal as well as upmarket furnishings, water and energy conservation systems.
YishunFty.jpg (33478 bytes)
Year of Completion: 2001
Value of Works($'million): 51
Client: HDB
Building & Electrical Works for the Erection of a 7-Storey Flatted Factory at Yishun Street 23 (Total 343 Industrial Units)

Year of Completion: 2001
Value of Works($'million): 17
Client: DSTA
Design & Build of Part 2/Part 3/Part 4 Storey SAF Warrant Officers & Specialists Club at Boon Lay Way
Year of Completion: 2001
Value of Works($'million): 14
Client: MITA
Proposed extension / additions and alterations to existing Singapore Conference Hall at Shenton Way / Maxwell Road

SunPlaza2.jpg (15484 bytes)

Year of Completion: 2000
Value of Works($'million): 73
Client: Canberra Development Pte Ltd
Erection of 12 Storey Commercial / Residential (76 Units) Building Comprising 2 Tower Blocks of 7 Storey Residential Apartment and a 5 Storey Podium with 2 basements at Sembawang Road (Sun Plaza)

Year of Completion: 1998
Value of Works($'million): 146
Client: HDB
Building works at Choa Chu Kang Neighbourhood 4 Contract 11

Year of Completion: 1998
Value of Works($'million): 65
Client: PWD
Construction of Civil Defence Academy at Jalan Bahar

Year of Completion: 1996
Value of Works($'million): 65
Client: HDB
Design and Build Contract including Piling, Civil Engineering, Building, Electrical, Lift, CATV, Sanitary, Water and Gas Installation at Jurong West Neighbourhood 6 Contract 1

Year of Completion: 1996
Value of Works($'million): 65
Client: CWT Distribution
Erection of A Part 4 Storey/5 Storey Warehouse with Ancillary Facilities at Jurong Port Road

Year of Completion: 1996
Value of Works($'million): 46
Client: Tech Park Pte Ltd
Erection of 3 Blks of Part4/Part5 Storey Terrace Factory (28 units) for Light Industry Use with PUB Substation at Kaki Bukit Ave 1 / Ave 3
Year of Completion: 1996
Value of Works($'million): 12
Client: JTC
Erection and Completion of One Block of 2-Storey Amenity Centre with One-Level Basement Carpark and Ancillary Works at International Business Park, Jurong East

Year of Completion: 1994
Value of Works($'million): 55
Client: SASCO
SASCO Hangar and a Part 2/Part 4 Storey Annex Block with Ancillary Facilities

Year of Completion: 1994
Value of Works($'million): 19
Client: P.T. Koh Brothers Indonesia
Batam First City Complex - construction of 28 units of highrise apartments and 250 units of shops and offices, supermarket and a bowling-alley

Year of Completion: 1993
Value of Works($'million): 66
Client: NTU
New Halls of Residence at Nanyang Avenue for Nanyang Technological University Combined Tender l & ll


CURRENT PROJECTS VALUE OF WORKS (S$)
Changi Water Reclamation Plant Contract C1A - Foundation Works, Site Development and Management
179,000,000.00
Changi Water Reclamation Plant Contract C3A - Liquids Module I Structural And Related Facilities
196,800,000.00
Proposed Construction of a Common Services Tunnels Phase 1 B & 2, Main Sewer and 5-storey Substation with Basement at Marine South
166,589,000.00
Marina Barrage at Marina South
226,000,000.00
Changi Water Treatment Plant Contract C6A - Facility Completion
23,600,000.00
COMPLETED ROAD, FLYOVER AND BRIDGE PROJECTS VALUE OF WORKS (S$)
Holland Road/Farrer Road/Queensway Interchange
45,785,000.00
Tampines Expressway/Lorong Halus Interchange
38,950,000.00
Central Expressway from Jalan Toa Payoh/PIE to Thomson Road
36,500,000.00
PIE Extension & Realignment - Interchange at Hong Kah
13,860,000.00
The Redevelopment of Esplanade Park, Empress Place and Fullerton Square
8,183,000.00
Proposed Interchange at Chin Swee Road/Outram Road/Tiong Bahru Road
7,690,000.00
The Construction of Open Storage Yard for the Proposed Container Freight Station at Pioneer Sector 3
1,604,000.00
Construction Car Parks at Yishun New Town Neighbourhood 7 Contract 4, 5 & 5A A/263/84
1,400,000.00
Construction of roads, drains carparks at Ang Mo Kio New Town Neighbourhood Contract
1,204,020.00
Sungei Tampines First Subdiary Drain Balance -Diversion of Tampines Road
1,068,000.00
Construction of outlet drain, car parks & sewer N2 Contract 14 & Ang Mo Kio New Town
915,000.00
Construction of Pasir Ris Ave 1 Road Bridge Across Sungei Tampines
870,000.00
Proposed Hardstanding and Drainage/Warehouse/Office/Container Yard plot A 11287 MK7 at Tuas Avenue 13 for M/s Pacific Container and Goldown (S) Pte Ltd
798,000.00
Repair to Existing Container Yard and Car Park and Driveway at 47 Jalan Buroh
740,000.00
Construction of cycle tracks, footpath, shelters, barbeque corners and park furniture at East Coast Park
715,000.00
Paving work to Tuas Ave 11 for M/s Kolam Terminal (S) Pte Ltd
517,000.00
Pavement Construction to propose Warehouse Complex on Penjuru Lane
500,020.00
Supply & Delivery & Construction of Interlocking concrete block paving footpath cum service road, Marine Park
448,000.00
Scotts Diversion Stage 1 & 2
348,258.00
Pavement Construction to existing Freight station No.2 at Penjuru Lane
330,000.00
Design and Construction of the Block Paving System for Container Stacking Yard at Keppel Wharves
240,000.00
COMPLETED DRAINAGE PROJECTS VALUE OF WORKS (S$)
Singapore River Development -Contract 4
25,600,000.00
Improvement to Kallang River from Braddell Road to Jalan Toa Payoh 
50,949,000.00
Bukit Timah Flood Alleviation Scheme Phase IIA Contract 4
36,360,000.00
Siglap Canal Improvement Scheme Downstream of Changi Road
19,495,000.00
Singapore River Development - Contract 2
18,100,000.00
Reconstruction of Geylang River -Contract 2
17,700,000.00
Sungei Lanchar Drainage Scheme Contract 1
10,400,000.00
Improvement to Sg Pandan Contract 2 (From Pan Island Expressway to Upper Ayer Rajah Road)
8,850,000.00
Sg Pang Sua Drainage Scheme Western Drain from Chinese Temple to Choa Chu Kang/Woodlands Road C3
6,785,026.00
Bukit Batok/Jurong East/Jurong West New Town Drainage Scheme C3 Concrete Lining of Sungei Jurong Western Subsidiary Drain
6,480,000.00
Hougang New Town Drainage Scheme Contract 1
6,200,000.00
Sungei Lanchar Drainage Scheme 2A, Construction of Subsidiary 
5,180,000.00
Joo Chiat Road Drainage Scheme Phase I: Improvement to Joo Chiat Road Outlet Drain Downstream of Marine Parade Road
4,970,000.00
Hougang New Town Drainage Scheme Contract
4,290,000.00
Improvement to Sg Tampines
4,250,000.00
Improvement to Queen's Road Outlet Drain
3,929,158.00
Kranji Catchment Drainage Scheme -Improvement to Sungei Tengah Contract 1
3,800,000.00
Construction of Outlet Drain & Trunk Sewer at Serangoon Central/West -Lor Chuan
3,200,000.00
Reconstruction of Alexandra Canal -Subsidiary Drain. Contract NO.1
2,900,000.00
Sungei Pang Sua Drainage Scheme Contract 6
2,880,000.00
Construction of Circulation and Drainage Systems at Pasir Ris Park
2,780,000.00
Ang Mo Kio Catchment Scheme Improvement to Outlet Drain Connection Drain No. 2,3,4,5,6,7,8 & 9.
1,924,175.00
Construction of Sungei Tampines First Subsidary Drain pt 2
1,832,000.00
Construction of Outlet Drain NO.2 (Part 2) at Yishun New Town
1,680,000.00
Completion of Remaining Work for Concrete Lining of Sg Kallang
1,529,000.00
Improvement of Sungei Mandai Contract II
1,220,000.00
Construction of 6.0m Wide Outlet Drain at Jurong West Extension A
1,075,000.00
Singapore River Development Contract 7
900,000.00
Construction of Outlet Drain No.2 at Kaki Bukit Estate
740,000.00
Serangoon Garden Drainage Scheme Phase II Contract 1
560,000.00
Reconstruction of Sungei Selarang Subsidiary Drain A
539,000.00
Construction of Culvert & Drain Transition at Sungei Pandan Kechil N'7 Clementi New Town 
369,000.00
Construction of Outlet of Drain NO.2 at Upper Changi Estate At N21
380,000.00
COMPLETED BUILDING PROJECTS VALUE OF WORKS (S$)
Building and Electrical Works at Jurong West Neighbourhood 6 Contract 30
87,200,000.00
Building and Electrical Works at Jurong West Neighbourhood 6 Contract 29
59,790,000.00
Proposed Erection of 12 Storey Commercial/Residential (76 Units) Building Comprising 2 Tower Blocks of 7 Storey Residential Apartment and a 5 Storey Podium with 2 basements at Sembawang Road
73,038,880.00
Construction of Civil Defence Academy at Jalan Besar
65,250,000.00
Building works at Chao Chu Kang Neighbourhood 4 Contract 11
146,000,000.00
Design development and construction of Singapore Cancer Centre at 3rd Hospital Avenue/Hospital Avenue/2nd Hospital Avenue, Singapore
42,690,000.00
Proposed Erection of A Part 4 Storey/5 Storey Warehouse with Ancillary Facilities at Jurong Port Road For CWT Distribution Limited
65,200,000.00
Design and Build Contract including Piling, Civil Engineering, Building, Electrical, Lift, CATV, Sanitary, Water and gas Installation at Jurong West Neighbourhood 6 Contract 1
65,173,206.00
Proposed Design & Build Part 2/Part 3/Part 4 Storey SAF Warrant Officers & Specialists Club at Boon Lay Way
17,622,000.00
Proposed extension/additions and alterations to existing Singapore Conference Hall at Shenton Way/Maxwell Road, Singapore
14,700,000.00
Erection and Completion of One Block of 2-Storey/Amenity Centre with One-Level Basement Carpark and Ancillary Works at International Business Park, Jurong East
12,479,216.00
Design & Build Contract for Proposed Erection of 3-Storey Single-User, Single-Occupier Factory at Tuas South Avenue 7, Singapore
7,611,853.43
Proposed Underpinning & First Storey Lobby Works for 5-Storey with 4 Basement Extension Additions & Alterations & Temporary Driveaway to Existing 5-Storey Thomson Medical Centre at 339 Thomson Road, Singapore
2,480,000.00
Proposed Erection of 3 Blocks of Part 4/Part 5 Storey Terrace Factory (28 Units) for Light Industry Use with Pub Substation at Kaki Bukit Avenue 1/Avenue 3, Singapore
46,830,451.46
Erection and Completion of Single-Storey Warehouse at Pulau Damar Laut, Singapore Shenton Way/Maxwell Road, Singapore
4,720,000.00
Construction of Piled Foundation and Basement Works for the Central Ministries Building at Hill Street/High Street, Singapore 
18,183,000.00
Improvement to Sungei Punggol Contract 6 
5,608,300.00
Proposed Renovation & General Repair & Redecoration to Existing CHIJ -S1. Nicholas Girls' School at Ang Mo Kio Avenue 2/Street 13
4,890,000.00
Erection and Completion of Building Contract including Sanitary, Water and Gas Installation, Demolition of no. Existing Electrical Substation and Civil Engineering Works at Kallang/Whampoa Redevelopment Contract 3
29,970,000.00
Substructures and Civil Works for National University Hospital Phase 3 at Lower Kent Ridge Road, Singapore
12,972,000.00
Project 9014 C6 Main Contract for the Proposed Hangar and a Part 2/Part 4 Storey Annex Block with Ancillary Facilities 
55,084,532.00
Proposed Ngee Ann Polytechnic Phase IV Expansion Programme at 5 Clementi Road 
22,500,000.00
Batam First City Complex - Construction of 28 units of highrise apartments and 250 units of shops and offices, supermarket and a bowling-alley
18,500,000.00
Proposed New Halls of Residence at Nanyang Avenue for Nanyang Technological University Combine Tender I & II
66,925,098.00
Proposed Erection of a Part Single-Storey/Part 3-Storey Factory at Tuas Avenue 18,Singapore
3,690,000.00
Proposed 6 Terrace Houses and 2 pairs of Semi-Detached at Florence Road/Florence Close
2,500,000.00
Proposed Erection of Single Storey Factory cum 3 Storey Workshop and Office at Sungei Kadut Drive
3,286,000.00
Construction of Building 10 and Ancillary Works at Tuas, Singapore 
14,450,000.00
Erection and Completion of Ten T8 Terrace Factories and Two Double Ring Main Electrical Substations at Woodlands East Industrial Estate
9,750,000.00
Erection and Completion of 13 units of C8 std factory with bin centre/guard houses at Tuas Link, Jurong
22,780,000.00
Proposed additions & alternation to existing community hospital on Lots 84-31, 84-35 & 84-43
2,133,000.00
Erection and Completion of 10 units of T6 terrace factory with bin centre at Senoko Crescent 
4,960,000.00
Erection and Completion of 4 Storey Warehouse cum Office Building and Container Depot at Tuas Avenue 13
16,230,000.00
Project LE(D) 992 C1 Proposed Storehouse at Tanjong Gul Camp
1,048,000.00
Proposed Warehouse Complex on Lot A 10299, Penjuru Lane
2,136,959.00
Proposed Antenna Tower & Equipment Room on the 41 st Storey PSA Building
345,000.00
Proposed Maju Complex at Clementi Road -Earthwork Phase I, II & III
45,599,000.00
Proposed Single Storey Veterinary Clinic at Whitney Road
700,000.00
Proposed 2 units of Double Storey Terrace Houses at Sandilands Road
330,000.00
Factory with Office, Service Workshops, Worker Quarters, etc at Jalan Perwira
2,000,000.00
4x2 Storey Semi-Detached Bungalow at Palm Grove Avenue
1,500,000.00
Renovation of Education Centres
• Bedok South-Blk 30 Ave 2 #01-784
• Tampines North-Blk 426 Pasir Ris Dr 6 #01-73
• Tampines West-Blk 140 St 12 #01-426
• Tampines East-Blk 261 St 21 #01-300
1,643,000.00
Building & Electrical Works for the Erection of a 7-Storey Flatted Factory at Yishun Street 23
51,800,000.00
Design & Build for Provost & Armour Cluster in Kranji Camp
70,798,000.00
Singapore Civil Defence Force Headquarters Complex at Ubi Avenue 4
73,650,000.00
Proposed Erection of One Block of Part 12 Storey and 11 Storey Flats (Total 108 Units) with 2 Basement Carparks and Swimming Pool at Jalan Mutiara/Kay Poh Road
22,000,000.00
Design & Build for Keat Hong Camp D2000-00467-010 (Formerly known as Choa Chu Kang Camp)
60,500,000.00
Proposed Erection of 5 Blocks of 12-Storey Condominium Development at Lengkong Tiga ("Starville Condominium")
42,522,596.00
COMPLETED OTHER CIVIL ENGINEERING PROJECTS VALUE OF WORKS (S$)
Construction of Reinforced Concrete Slab Over Drain at Changi Business Park
3,780,000.00
Piling, Diaphragm Wall and Basement Structure for New 'E' Division Police Headquarters at Kampong Java Road
7,980,000.00
Proposed Heavy Vehicle Parking Facilities at Old Toh Tuck Road Stage 1 Construction 
810,000.00
Reconstruction of Murnane Service Reservoir-Civil works, works, telemetry, small power and lighting
31,313,000.00
Improvement Works at Freight Station 1 & 3 for C&P
649,000.00
Spent Scrubber Water Pipeline Route C3 -Land Line
629,110.00
Spent Scrubber Water Pipeline
701,000.00
Earthworks and Associate Civil Engin'eering Works for the proposed Maju Camp
7,260,000.00
Construction of Pile Caps, Ground Beams & Ancillary Work for 10 Storey Warehouse at Alexandra/Pasir panjang Road
6,915,649.00
D751 Demolition, Earthworks & Drainage at Kranji
538,950.00
A Site Clearance, Earthworks & Drainage at Amoy Quee Camp
1,736,492.00
Jurong Sewage Treatment Works Phase III Extension Contract 1 - Influent Lift Station and Inlet Works II (Civil Works)
17,964,000.00
Contract 710 - (Base Tender B) Design, Construction and Completion of Outram Park Station including Tunnels
199,873,831.85
Proposed Construction of a Common Services Tunnels in the Marina South - Stage 1 (Balance of Work)
41,700,000.00
COMPLETED MARINE AND PORT RELATED PROJECTS VALUE OF WORKS (S$)
Proposed Construction of Canal Walls, Bridges, Sluices, Locks, Mooring Posts and Ancillary Works on Sentosa Cove
12,774,737.60
Construction of Phase 1 B container staking yard for new container terminal at Pasir Panjang Road
161,000,000.00
Land Reclamation, Phase 1, at Xinjin River Mouth, Shantou, China 
122,848,000.00
Conversion of Berths M19 & M22 into Container Berths including Construction of Container Stacking Yard (Phase 1), Keppel Terminal
24,470,000.00
Modification to Existing Berths P4A1P4B, Pasir Panjang Terminal
4,160,00.00
Proposed Extension of Jurong Fishery Port Wharf
7,459,190.00
Sungei Lanchar Drainage Scheme Contract 1 (400,000 Cubic Meters of Dredging Work) 
10,400,000.00
Construction of Drains at Changi North Bay Reclaimed Land
3,460,000.00
Kranji Catchment Drainage Scheme Improvement to Sungei Tengah Contract 1(500,000 cubic metres of Dredging Works)
3,800,000.00
Phase C05 - Container and Stacking Yard Over Existing Berth at Pasir Panjang Terminal
26,532,000.00

 
Copyright 2009 Koh Brothers Group Limited. All Rights Reserved.